One of these signs is not like the other sign:

Date: Friday, 6 Juneth 2008
Time: 9:00AM
Place: 1 Bloor
Bloor & Yonge

Date: Friday, May 30th 2008
Time: 8:00AM
Place: 1 Bloor
Bloor & Yonge
Demolition is not starting, huh? This bodes well for the planned occupancy date, doesn’t it?
It’s The Toronto Way™, yo.







I am surprised they did not pay students to stand in line and pretend that the are demolishing the building…
[...] located at Canada’s best-known intersection. It took them four months to tear down the (apparently indestructable) 3-storey buildings occupying the lot, and for the past two months it can best be described as a [...]